Intermediate Treatment site Final disposal site Advanced Water Treatment facility

Intermediate Treatment site

Before landfilling industrial waste, it can be sorted, reduced, been non-toxic, and stabilized.

  • site area:22,853㎡
  • total facility area:8,020㎡

Final disposal site

landfill non-reusable waste generated in Intermediate treatment process.

  • reclamation area:7.8hectare
  • reclamation capacity: 2,110 thousands m3

Advanced Water Treatment facility

After advanced treatment by perfect clarification system using liner sheets, clarificated water is sluiced into a river.

  • processing ability: about 400ton per day

Total production cycle

The production cycle in recycling-based society should be the total cycle including the following three cycles.
1. Traditional production process cycle using materials derived from natural resources.
2. Consumption cycle
3. Reproduction cycle using renewable resources
The resources are treated as the final disposal of materials will be restored till it can be reused in the future.

The total production cycle in recycling-based society

Total Management System

For appropriate waste treatment, we operate Total Management System that managing from Collecting and transferring to intermediate treatment to environmental chemical analysis to final disposal in between.

Our total management systems puts emphasis on security is seen in uniform management of Electric manifests by computers. Brought vehicles and wastes are recorded by monitoring system. Therefore, it is possible for us to raise deterrent effects on inappropriate treatment and foreign matter and to clear up records of wastes. In addition, we simulate if injustices are done again and again, so that the process can be as safe as possible.